PwrBlade® Cable Assemblies & Connectors

Amphenol FCI PwrBlade® Cable Assemblies and Connectors mate to PwrBlade right-angle or vertical board-mounted headers. By expanding beyond board-to-board applications, designers can connect power supplies and power distribution subassemblies in a wider range of applications. The combination of cable connection capability with Amphenol's proven PwrBlade board-to-board system provides a universal power distribution connector system. The PwrBlade connectors are available in squeeze-to-release form factors for applications that require active latching and in panel-mount configurations for modular installation of large power distribution systems. The PwrBlade power distribution connector system provides both power and signal contacts to enable power distribution and power control in a single connector. Amphenol PwrBlade connectors are also available in a wide variety of configurations.

All Results (236)

Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Amphenol FCI Power to the Board 16S+4P+8S+6P+8S HDR Non-Stocked Lead-Time 20 Weeks
10,83 €
9,61 €
9,24 €
8,87 €
Min.: 1
Mult.: 1
Amphenol FCI Power to the Board 6P R/A HDR Non-Stocked Lead-Time 20 Weeks
5,11 €
4,91 €
Min.: 264
Mult.: 264
Amphenol FCI Power to the Board 32S+11P R/A HDR Non-Stocked Lead-Time 20 Weeks
9,05 €
9,03 €
8,87 €
8,67 €
Min.: 132
Mult.: 132
Amphenol FCI Power to the Board 9P+24S R/A HEADER Non-Stocked Lead-Time 18 Weeks
11,88 €
10,77 €
10,76 €
7,69 €
Min.: 1
Mult.: 1
Amphenol FCI Power to the Board PWRBLADE VH PF-51700-10204802CALF Non-Stocked Lead-Time 7 Weeks
Amphenol FCI Power to the Board 552-5EAF-PWRBLADE HEADER - VERT Non-Stocked Lead-Time 7 Weeks
Amphenol FCI Power to the Board PWRBLADE RAH PF-51720-10204802CALF Non-Stocked Lead-Time 7 Weeks
Amphenol FCI Power to the Board VT STB HDR PWRBLADE Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board 1P 6S PWRBLADE VERTICAL HEADER Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board 34P VERT HEADER Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board 2P 16S 2P PWRBLADE VERTICAL HEADER Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board PWRBLADE V/T HDR Non-Stocked Lead-Time 7 Weeks
Amphenol FCI Power to the Board PWRBLADE V/T HDR Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board PWRBLADE HEADER VERTICAL Non-Stocked Lead-Time 7 Weeks
Amphenol FCI Power to the Board PWRBLADE VH PF-51700-10101601CALF Non-Stocked Lead-Time 7 Weeks
Amphenol FCI Power to the Board PWRBLADE VH STB-51700-10200802AALF Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board PWRBLADE VH-51700-10208002AALF Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board PWRBLADE VH STB-51700-10302408AALF Non-Stocked Lead-Time 7 Weeks
Amphenol FCI Power to the Board VERT PF HDR PWRBLADE Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board PWRBLADE VH PF-51700-10500805CALF Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board PWRBLADE VH-51700-10802408CALF Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board PWRBLADE VH STB-51700-10803208AALF Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board PWRBLADE V/T PF HDR Non-Stocked Lead-Time 7 Weeks
Amphenol FCI Power to the Board PWRBLADE VH-51700-11004410CCLF Non-Stocked Lead-Time 6 Weeks
Amphenol FCI Power to the Board 8PWR 24SIG CONTACTS VERTICAL HDR Non-Stocked Lead-Time 6 Weeks